Exhibition stand start-to-end processes;

Exhibition Stand Design Is Made
Exhibition stand design is the first stage your exhibition stand is designed with our team’s design experience by collecting information and requests from you.

Production Starts After Design Approval
After your design is approved,Perge architecture starts to produce your stand in our own structure, iron, wood and paint workshops start to produce your stand according to the size and need of your stand, this process takes some time.

We enter the exhibition area on your behalf and start the installation process
Fair areas are very limited for the installation of stand this time is 3-5 days in most fairs. No doubt in this process, because Perge architecture has a very strong installation team, the entire installation team will be happy to perform the installation of the stand.